| Date built |
1982 |
| Flag |
British |
| Length overall |
141.5m |
| Breath |
19.4m |
| Draft(max) |
6.0m |
| Capacity(max) |
- Cable Load Capacity - 2000 tonnes
nominal
- Cable volume = 1200m3
- No of repeaters - 35
|
| Submersible capability |
- Permanently installed remotely operated vehicle
- Equipped to deploy a cable plough burial system
|
Speed & fuel
consumption |
- maximun - 14 knots @ 28 tonnes/day
- Crusiing - 11 knots @ 20 tonnes/day
- Cable working/ROV @ 15 tonnes/day
- In port @ 4 tonnes/day
|
| Endurance(max) |
50 days |
| Navigational aids |
- Full suites of duplicated modern navigational, shallow water and deep-water bathymetry recording equipement.
|
| Station keeping |
- Single screw propeller
- Twin Azimuthing stern thrusters
- Three tunnel thrusters Forward (35 tonne total).
|
Cable handling
equipment |
- Two 4m electrically driven drum engines
- Two draw off/hold back cable engines.
- Two cable transporters
|
| Deck equipment |
- 35 tonne SWL 'A' frame
- Deck Cranage
|
Communication facilities |
- SATCOM with voice, fax and e-mail availability
|
Accommodation
availability |
- 60 officers, crew and representatives
- a selection of single berth cabins, with
office facilities available.
|