For Charter

Charter/Sale

 

Working Barges

Date built           1999
Flag           Panama
Length overall           60m
Breath           20.5m
Draft(max)           2.9m
Capacity(max)
  • Cable Load Capacity - 750 tonnes
    nominal
  • Cable volume = 163m3
  • No of repeaters - 3
Submersible capability
  • purpose built to depoly shallow water
    deep burial tools providing 3m to
    10m burial in water depths up to 70m
  • Capable or rock cutting to 4m depth
Speed & fuel
consumption
  • maximun - 7 knots @ 6 tonnes/day
    Crusiing - 5 knots @ 5 tonnes/day
    In port @ 1.5 tonnes/day
Endurance(max)           45 days
Navigational aids
  • Full suite of modern navigational
    equipment capable of providing 3m
    accuracy
Station keeping
  • Four 420kx scottel thrusters
    Simrad Simplex dynamic positioning system
Cable handling
equipment
  • twin tank and cable highway for
    simultaneous dual cable installation
    and burial
  • two 2 wheel pair linear cable engines
Deck equipment
  • One 200 tonne (70 tonne at 14m)
    pedestral crane
  • one 10 tonne deck-working crane
  • two 20m spuds
    seven poiint mooring system

Communication facilities

  • SATCOM with voice, fax and e-mail availability
Accommodation
availability
  • 46 officers, crew and representatives
  • a selection of single berth cabins, with
    office facilities available.

 

Date built           1982
Flag           British
Length overall           141.5m
Breath           19.4m
Draft(max)           6.0m
Capacity(max)
  • Cable Load Capacity - 2000 tonnes
    nominal
  • Cable volume = 1200m3
  • No of repeaters - 35
Submersible capability
  • Permanently installed remotely operated vehicle
  • Equipped to deploy a cable plough burial system
Speed & fuel
consumption
  • maximun - 14 knots @ 28 tonnes/day
  • Crusiing - 11 knots @ 20 tonnes/day
  • Cable working/ROV @ 15 tonnes/day
  • In port @ 4 tonnes/day
Endurance(max)           50 days
Navigational aids
  • Full suites of duplicated modern navigational, shallow water and deep-water bathymetry recording equipement.
Station keeping
  • Single screw propeller
  • Twin Azimuthing stern thrusters
  • Three tunnel thrusters Forward (35 tonne total).
Cable handling
equipment
  • Two 4m electrically driven drum engines
  • Two draw off/hold back cable engines.
  • Two cable transporters
Deck equipment
  • 35 tonne SWL 'A' frame
  • Deck Cranage

Communication facilities

  • SATCOM with voice, fax and e-mail availability
Accommodation
availability
  • 60 officers, crew and representatives
  • a selection of single berth cabins, with
    office facilities available.